Telure Standard 2026.1
The Telure Standard for a trampoline court
A versioned, Telure-curated program of checks for a trampoline court, written in Telure’s own words and organized by how the facility actually runs: the daily rhythm first, then the recurring program above it. It is a documented reference the facility measures its own work against and records reasons against, not a certification. The basis register below shows what informs it, and at what depth.
ASTM F2970-informed alignment tracker
Inside Telure, this list is an alignment tracker a facility turns on with a checkbox. The recurring program below is its clause list, informed by ASTM F2970. The facility matches its own tasks, checklist items and training items to the clauses they cover, marks the clauses that do not apply with a written reason, and its exports state what share of the rest has a check behind it.
This tracker is Telure's own clause list, informed by the organization's published document. It does not replace reading that document yourself and verifying your facility against it, and marking a clause here is a note on your own record, not a statement by that organization. Where equipment is involved, the manufacturer's documentation governs.
The daily rhythm
Opening walk
Walked before the doors open, item by item, each answer attributed to the person who gave it. The starting set for a trampoline court:
- Beds clear of debris: no rips, sags, or exposed stitching
- Springs hooked and covered: no gaps at pad seams
- Pads seated over frames and springs, attachments tight
- Foam pit at fill line, entry pads secure
- Netting and enclosures taut: no tears or open gaps
- Court dividers padded and secure
- Fall zones and walkways clear of objects
- Capacity and rules signage in place
- Access gates latch and close properly
- First aid kit stocked; AED accessible
During hours
Anything flagged during the day opens a corrective entry on the spot: the item, the finding, and who saw it. Taking equipment or an area out of service is a recorded event with a name attached, and so is returning it. Nothing waits for the end of the shift to become a record.
Closing check
The end-of-day counterpart every facility runs: securing the space and making sure nothing the day surfaced dies overnight.
- Activity areas clear: no members left inside
- Hazards cleared from floors and landing surfaces
- Equipment secured, stowed, or powered down per procedure
- Today's flagged items have maintenance entries opened
- First aid and rescue equipment restocked if used today
- Exits clear; doors, gates and access points secured
The recurring program
The work above the daily walk. Each task surfaces on the day it is due and escalates as it goes overdue. Where a check addresses a published designation, the citation chip names it; a chip is a reference, never a compliance claim.
Weekly
Bed & spring inspection · court by court
Walk every court position: bed fabric, stitching, sag, spring stretch and hook seating. Record replacements against the position. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.
addressing ASTM F2970Pad coverage & attachment inspection
Confirm full pad coverage over frames and springs: no exposed steel, no lifted seams, attachments tight. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.
addressing ASTM F2970Foam pit depth & fill measurement
Measure fill level against the fill line and depth at corners. Record the numbers. A measured series is what makes foam retirement defensible. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.
addressing ASTM F2970
Monthly
Foam pit full turn & degraded-foam cull
Rotate pit foam bottom to top, cull compacted or torn blocks, and record counts removed and added. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.
addressing ASTM F2970Frame, weld & anchor inspection
Inspect frame members, welds, floor anchors, and fastener torque on a rotating section of the park. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.
addressing ASTM F2970Netting & enclosure inspection
Check enclosure nets and containment: tension, tears, attachment points, and gaps a limb could reach through. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.
addressing ASTM F2970Add-on attraction hardware check
Basketball hoops, ninja elements and other add-ons: mounts, fasteners, and padding at contact points. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.
addressing ASTM F770
Quarterly
Emergency action plan review
Walk the EAP with staff on shift: rescue steps for the pit, exits, and the incident documentation flow. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.
addressing ASTM F770
Every 6 months
Staff training & court-monitor review
Confirm current training records for every active court monitor; schedule refreshers before they lapse. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.
addressing ASTM F770
Yearly
Full structural inspection (qualified person)
Full inspection of courts, framing, anchors and attractions by a qualified person; file the report against this task. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.
addressing ASTM F2970
The basis register
What informs this pack, at what reference depth, and when each entry was last checked against its source. An entry here means the pack is informed by the document named; it never means the pack, or any facility using it, is certified to or compliant with it.
| Source | Tier | Jurisdiction | Access | Verified |
|---|---|---|---|---|
| ASTM F2970ASTM International (Committee F24) · F2970-25Covers the full lifecycle of commercial trampoline courts: design, manufacture, installation, operation, maintenance, inspection and major modification. | Tier 3Voluntary consensus standard | US | Purchase required | Checked 2026-08-31 |
| ASTM F770ASTM International (Committee F24) · F770-24Owner and operator duties for amusement rides and devices: operating procedures, maintenance, inspection and staff training. | Tier 3Voluntary consensus standard | US | Purchase required | Checked 2026-08-31 |
| State amusement ride and device codes (where adopted)Some states regulate amusement devices, trampoline courts among them, by incorporating ASTM F24 standards into law. The facility's own state code determines whether and which editions apply. | Tier 2Standard incorporated into law | US, varies by state | Free to read | Not independently verified |
| Manufacturer documentation for installed equipmentOperator-supplied manuals, bulletins and service documents. Where any pack cadence differs from a manufacturer's documented interval, the manufacturer's interval governs. | Tier 5Manufacturer documentation | n/a | Operator-supplied | Not independently verified |
The manufacturer’s documentation governs
Where a manufacturer's documentation sets an inspection type or an interval for a piece of equipment, that documentation governs. The pack's cadences are a program to build on, not a replacement: when the two differ, Telure shows the difference so it can be seen and documented, and the recorded schedule follows the manufacturer.
Where Telure stands
The Telure Standard is Telure's own curated program. Telure is not affiliated with, endorsed by, or licensed by any standards body or association named here, and adopting the Telure Standard does not make a facility compliant with, approved under, or certified to any standard. Where equipment is involved, the manufacturer's documentation governs inspection types and intervals.