Telure Standard 2026.1
The Telure Standard for a inflatable attractions
A versioned, Telure-curated program of checks for a inflatable attractions, written in Telure’s own words and organized by how the facility actually runs: the daily rhythm first, then the recurring program above it. It is a documented reference the facility measures its own work against and records reasons against, not a certification. The basis register below shows what informs it, and at what depth.
ASTM F2374-informed alignment tracker
Inside Telure, this list is an alignment tracker a facility turns on with a checkbox. The recurring program below is its clause list, informed by ASTM F2374. The facility matches its own tasks, checklist items and training items to the clauses they cover, marks the clauses that do not apply with a written reason, and its exports state what share of the rest has a check behind it.
This tracker is Telure's own clause list, informed by the organization's published document. It does not replace reading that document yourself and verifying your facility against it, and marking a clause here is a note on your own record, not a statement by that organization. Where equipment is involved, the manufacturer's documentation governs.
The daily rhythm
Opening walk
Walked before the doors open, item by item, each answer attributed to the person who gave it. The starting set for a inflatable attractions:
- Wind reading taken and logged at opening; record the number
- Anchor count and type at each unit matches its placard
- Ballast weights placed and filled where staking isn't possible
- Stakes flush to grade and capped, tethers taut
- Seams, stitching, and patches intact; no lifting edges
- Netting and entry closures intact, zippers hold
- Blower cages clear, cords sound, connection sleeves cinched
- Units fully inflated; no soft walls or slow leaks
- Fall zones and ground cover clear; stakes and lines flagged
- Capacity, age, and height signage posted at each unit
- First aid kit stocked; wind meter on hand and working
During hours
Anything flagged during the day opens a corrective entry on the spot: the item, the finding, and who saw it. Taking equipment or an area out of service is a recorded event with a name attached, and so is returning it. Nothing waits for the end of the shift to become a record.
Closing check
The end-of-day counterpart every facility runs: securing the space and making sure nothing the day surfaced dies overnight.
- Activity areas clear: no members left inside
- Hazards cleared from floors and landing surfaces
- Equipment secured, stowed, or powered down per procedure
- Today's flagged items have maintenance entries opened
- First aid and rescue equipment restocked if used today
- Exits clear; doors, gates and access points secured
The recurring program
The work above the daily walk. Each task surfaces on the day it is due and escalates as it goes overdue. Where a check addresses a published designation, the citation chip names it; a chip is a reference, never a compliance claim.
Weekly
Anchor & ballast inventory check
Count every stake, tether, and ballast bag against each unit's placard. Pull-test suspect stakes, top up water ballast, and swap bent or burred stakes from spares. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.
addressing ASTM F2374Seam, patch & attachment-point walk
Walk every unit at pressure: seams, stitching, existing patches, netting, and anchor-point webbing. Record wear against the unit so its structural history stays queryable. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.
addressing ASTM F2374Blower, cord & connection inspection
Each blower: intake cage clear, housing sound, cord and plug undamaged, ground-fault protection tested, connection sleeve tight at the cuff. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.
addressing ASTM F2374
Monthly
Wind meter & evacuation-plan check
Confirm the wind meter reads sensibly against a second reference and has fresh batteries, and that posted evacuation thresholds and rally points match the current site layout. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.
addressing ASTM F2374Full deflation & interior inspection
Deflate one unit on rotation and inspect what pressure hides: internal baffles, seam backs, zipper tracks, and floor wear. Record findings against the unit. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.
addressing ASTM F2374
Quarterly
Wind evacuation drill review
Run the evacuation drill with staff on shift: threshold readings, the clear-the-units call, guest handling on slides, and the reopening decision. Log timing and gaps found. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.
addressing ASTM F2374
Every 6 months
Setup & takedown crew training review
Confirm every setup crew member has current training on anchoring order, ballast placement, blower connection, and takedown fold; refresh before the busy season. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.
addressing ASTM F2374
Yearly
Registration certificate expiry review
Review every unit's operating registration and its expiry date; file renewals well ahead and record the new certificate numbers against each unit. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.
Full fleet inspection (qualified person)
Full inspection of every unit, blower, and anchor system by a qualified person; file the report against this task and open corrective items for anything cited. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.
addressing ASTM F2374
The basis register
What informs this pack, at what reference depth, and when each entry was last checked against its source. An entry here means the pack is informed by the document named; it never means the pack, or any facility using it, is certified to or compliant with it.
| Source | Tier | Jurisdiction | Access | Verified |
|---|---|---|---|---|
| ASTM F2374ASTM International (Committee F24) · F2374-24Design, operation, maintenance, inspection and training for blower-inflated amusement devices. | Tier 3Voluntary consensus standard | US | Purchase required | Checked 2026-08-31 |
| State amusement ride and device codes (where adopted)Some states regulate amusement devices, trampoline courts among them, by incorporating ASTM F24 standards into law. The facility's own state code determines whether and which editions apply. | Tier 2Standard incorporated into law | US, varies by state | Free to read | Not independently verified |
| Manufacturer documentation for installed equipmentOperator-supplied manuals, bulletins and service documents. Where any pack cadence differs from a manufacturer's documented interval, the manufacturer's interval governs. | Tier 5Manufacturer documentation | n/a | Operator-supplied | Not independently verified |
The manufacturer’s documentation governs
Where a manufacturer's documentation sets an inspection type or an interval for a piece of equipment, that documentation governs. The pack's cadences are a program to build on, not a replacement: when the two differ, Telure shows the difference so it can be seen and documented, and the recorded schedule follows the manufacturer.
Where Telure stands
The Telure Standard is Telure's own curated program. Telure is not affiliated with, endorsed by, or licensed by any standards body or association named here, and adopting the Telure Standard does not make a facility compliant with, approved under, or certified to any standard. Where equipment is involved, the manufacturer's documentation governs inspection types and intervals.