A versioned, Telure-curated program of checks for a CTE shop, written in Telure’s own words and organized by how the facility actually runs: the daily rhythm first, then the recurring program above it. It is a documented reference the facility measures its own work against and records reasons against, not a certification. The basis register below shows what informs it, and at what depth.

Alignment tracker

Inside Telure, this list is an alignment tracker a facility turns on with a checkbox. The recurring program below is its clause list, informed by the manufacturer's manual and general safety practice, because no consensus operational standard exists for this facility type. The facility matches its own tasks, checklist items and training items to the clauses they cover, marks the clauses that do not apply with a written reason, and its exports state what share of the rest has a check behind it.

This tracker is Telure's own clause list, informed by the organization's published document. It does not replace reading that document yourself and verifying your facility against it, and marking a clause here is a note on your own record, not a statement by that organization. Where equipment is involved, the manufacturer's documentation governs.

The daily rhythm

Opening walk

Walked before the doors open, item by item, each answer attributed to the person who gave it. The starting set for a CTE shop:

  • Every machine guard in place at the point of operation before the first cut of the period
  • Blade guard, riving knife and anti-kickback pawls fitted on the table saw
  • Band saw upper guide and guard lowered to the work, not left high after a blade change
  • Jointer cutterhead guard springs back over the knives on its own
  • Grinder work rests and tongue guards set close to the wheel with no gap opened up
  • Eye protection worn by everyone inside the shop line, visitors included
  • Face shields and welding helmets at the stations that need them, lenses unpitted
  • Welding screens pulled around every bay with an arc struck behind them
  • Welding bay extraction arms positioned at the arc and pulling
  • Dust collector running with the right blast gates open before any machine is started
  • Floors, ledges and machine tops clear of dust and swarf at the end of the period
  • Oily and finish soaked rags in a closed metal can, not in the trash
  • Compressed gas cylinders chained upright with caps on anything not in use
  • Vehicle lift arms, locks and restraints set and audibly engaged before anyone goes under
  • Jack stands under any vehicle raised off a jack
  • Machine disconnects and the master shutoff clear and reachable, nothing stored in front
  • Tool crib checked back in at the end of the period: nothing left in a machine or on a bench

During hours

Anything flagged during the day opens a corrective entry on the spot: the item, the finding, and who saw it. Taking equipment or an area out of service is a recorded event with a name attached, and so is returning it. Nothing waits for the end of the shift to become a record.

Closing check

The end-of-day counterpart every facility runs: securing the space and making sure nothing the day surfaced dies overnight.

  • Activity areas clear: no members left inside
  • Hazards cleared from floors and landing surfaces
  • Equipment secured, stowed, or powered down per procedure
  • Today's flagged items have maintenance entries opened
  • First aid and rescue equipment restocked if used today
  • Exits clear; doors, gates and access points secured

The recurring program

The work above the daily walk. Each task surfaces on the day it is due and escalates as it goes overdue. Where a check addresses a published designation, the citation chip names it; a chip is a reference, never a compliance claim.

Weekly

  • Machine guard and point of operation check: machine by machine

    Machine by machine, with the machine stopped and the guard in your hand: the point of operation guarded so a hand cannot reach the cutter during the cycle, blade and cutterhead guards fitted and returning to the covering position on their own, spreaders and anti-kickback devices in place on the ripping saws, belt, pulley, chain and shaft guards closed on every drive, and the machine sitting where it belongs on its anchors with nothing walking. Weekly because a guard is removed for a setup, a dado, a blade change or a long rip and the class after that one is the class that finds out. This is the interval a project cycle runs on, not the year. Record the finding against that registered machine, and where the guard's adjustment comes out of the manufacturer's manual, set it to what the manual says and not to what looks right. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.

    addressing 29 CFR Part 1910
  • Eye and face protection: station stock, lens condition and the eyewash

    Station by station: safety glasses and goggles stocked in the trays and issued at the door, side protection on everything handed out, face shields at the grinders and the lathes, welding helmets and hand shields at the bays with their filter lenses unpitted and their cover lenses clear, and anything cracked, crazed, pitted or missing a side shield pulled out of circulation rather than put back. Then the eyewash and drench facility on the same pass: reachable without going through a door, unobstructed, flushed, and the flush dated. Weekly because this is consumable stock in a room where a hundred pairs of hands pass through it, and a tray empties and a lens gets scratched on a class-by-class basis rather than on a calendar. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.

    addressing 29 CFR Part 1910
  • Portable power tool and hand tool condition walk

    Out of the crib and along the benches: cords and plugs uncut and ungrounded nowhere, strain reliefs intact, guards on the portable circular saws with the lower guard snapping back on its own, guards on the angle grinders and sanders, switches returning to off when released and no switch taped or wedged on, chisels and punches without mushroomed heads, files with handles, and nothing running with a cracked housing or a missing knockout. Pull anything doubtful into the crib rather than back onto the rack. Weekly because these are the tools that get handled by every pair of hands in the building and put away by whoever is nearest to the rack, so their condition changes on a class schedule rather than a maintenance schedule. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.

  • Dust and swarf housekeeping walk: floors, ledges, beams and machine tops

    Walk each shop with a light and look up as well as down: floors and under the benches, the tops of machines and cabinets, ledges, conduit runs, beams, light fixtures and the tops of the ductwork itself. What you are answering is how much has built up since last week and where, so record it area by area rather than as one verdict on the room. Weekly, on the last working day, because accumulation is continuous, it looks like nothing right up until it is a lot of something, and the last day of the week puts the answer on the record immediately before two days when nobody is in the building. Note how it was cleaned as well as that it was: sweeping and compressed air move fine dust into the air and onto the next ledge up. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.

Monthly

  • Emergency stop, disconnect and panel access check

    Machine by machine and then room by room. Run each machine and stop it on its own emergency stop, not on its normal control, and confirm it comes to rest and stays stopped rather than restarting when the stop is released. Then the isolation side with the power off: every machine's disconnect present, labeled to the machine it serves, reachable without moving anything, and able to accept a lock. Then the master shutoff in each shop, hit and reset with somebody watching what it actually drops. Then panel and disconnect clearance, because a shop stores material against a wall and a wall is where the panels are: nothing stacked, leaned or parked in front of a panel, a disconnect or the master shutoff. Monthly because proving a stop stops means running the machine and stopping it under power, which is a deliberate act taken out of instructional time rather than something done in passing. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.

    addressing 29 CFR Part 1910
  • Abrasive wheel setup and condition check: every grinder and cutoff saw

    Wheel by wheel, with the machine off and the guard opened: the wheel itself uncracked, unglazed, running true and not worn down past the figure in the manufacturer's manual; the work rest set close and square with no gap opened up between it and the wheel face; the adjustable tongue brought back down close to the periphery; the guard covering the spindle end, nut and flange and positioned where the manual puts it; and the flanges and blotters correct for that wheel. Sound each spare wheel before it is mounted rather than after. Monthly because the gap at the work rest and the tongue opens continuously as the wheel wears down, nobody notices it opening, and a month is short enough to catch the drift before the gap is wide enough to pull work into it. The wheel's maximum speed and mounting come from the manufacturer's manual and govern anything here. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.

    addressing 29 CFR Part 1910
  • Welding bay exhaust, screen and hot work check

    Bay by bay with a bay running: each extraction arm positionable and holding position at the arc, capture actually pulling at the hood rather than the fan merely turning, ducts and flex hose unsplit and unblocked, filters within their loading, and general ventilation moving air through the room. Then the bay itself: screens and curtains hung and unshredded, the floor and walls around the bay free of combustibles and openings, hoses and leads uncut and untaped, extinguishers at the bays and the fire watch arrangement written down and known. Monthly because the arms get pushed around every single day but the system's actual capture degrades slowly with filter loading and duct build-up, and slow degradation is exactly what a period walk cannot see. Where the work is on galvanized, plated, coated or unknown metal, the material governs what extraction and protection it needs. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.

    addressing 29 CFR Part 1910
  • Compressed gas cylinder and flammable liquid storage inspection

    Cylinder by cylinder and can by can. Cylinders upright, secured against falling, valve protection caps on everything not connected for use, oxygen kept away from fuel gas and from oil and grease by distance or by a noncombustible barrier, empties marked and stored apart, and hoses, regulators and flashback protection sound with nothing showing burns, cuts or worn patches. Then flammable liquids: in flammable storage cabinets and safety cans with lids closing, containers labeled, quantities in the shop kept to what the period needs, and the oily and finish soaked rag can closed and emptied on a schedule. Monthly because storage state drifts rather than fails: a cap left off after a bottle change, a chain left unhooked, a can lid propped open, each of them harmless on the day and cumulative over a term. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.

    addressing 29 CFR Part 1910
  • Dust collection system inspection: bin, filters, ducts and blast gates

    At the collector and then along the run: bin or bag level well below full and emptied on a schedule somebody owns, filters intact and not blinded with the pressure differential read and recorded against last month's, fan and motor running clean with no rubbing or imbalance, housing and seams tight with no leakage dusting the floor beneath them, ducts and flex hose unsplit and unsagging, blast gates moving fully and closing where they should, and grounding and bonding continuous along the run. Then the machines at the far end: each hood and pickup still at the cut where it belongs. Monthly because everything here changes with hours of run time rather than with the calendar, and one blinded filter or one full bin drops capture at every machine on the trunk at once, which shows up as dust in the room long before anybody looks at the collector. Filter and bin intervals come from the manufacturer's manual. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.

Quarterly

  • Vehicle lift, jack and stand inspection

    Bay by bay with the bay empty and the lift cycled through its full travel: arms, adapters and pads undamaged and correct for the vehicles the program actually puts on them; arm restraints engaging; every load holding device dropping into its lock audibly and holding; cables, chains, sheaves, nuts and equalizers sound with no fraying, no slack and no leaks; columns, anchors and floor around them uncracked; and the controls, guards and warning decals in place and legible. Then the floor jacks, transmission jacks and jack stands out of the corner: rated capacity legible, no bent legs, no seized ratchets, no leaking rams, and stands in matched sets rather than mixed pairs. Quarterly because the pre-use check belongs to the class that is about to go under the car and lives in the period walk, while a deliberate look at locks, cables and stands needs the bay empty and the lift free, which is a shop-down job. The manufacturer's manual governs the lift's maintenance intervals, and the yearly inspection by a qualified inspector is its own task. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.

  • Finishing bench, spray area and rag storage inspection

    Wherever finish gets applied, whether that is a booth, a bench or a downdraft table: ventilation running and moving air away from the person doing the work, filters changed and dated rather than loaded and gray, residue and overspray cleaned off surfaces and fixtures rather than allowed to build, nothing electrical or spark producing inside the area that should not be, extinguishers at hand, and the finishes themselves stored where the flammable storage check covers them. Then the rag can, which is the part of this that starts fires: metal, self closing, actually closed, and emptied to a schedule rather than when it overflows. Quarterly because a finishing area's condition tracks the project calendar rather than the week, and it goes from spotless to loaded during the two or three weeks a year when every project is being finished at once. Schedule the pass into those weeks, not away from them. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.

Yearly

  • Energy control procedure review: every machine, every person

    Once a year, take the written procedure for isolating a machine and walk it against the machines and the people. Machine by machine: the procedure names this machine and its actual energy sources, including stored energy in springs, hydraulics, air and capacitors; its disconnect accepts a lock; and the devices the procedure calls for are on the lockout station and not in somebody's toolbox. Then person by person with each person who isolates machines: have them walk their own steps back to you, and record who was reviewed and what came out of it. Have the review done by somebody who does not use the procedure being reviewed, so it is an inspection and not a self report. Yearly because a written procedure drifts away from the machines it describes as disconnects are replaced, machines are moved and the people who isolate them change, and a year is the longest gap that still catches that drift before it is the reason somebody worked on a live machine. Where your own jurisdiction, your district policy or your insurer sets a different frequency or a different reviewer, that governs. Record deviations found as corrective items with owners rather than as notes. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.

    addressing 29 CFR Part 1910
  • Annual shop equipment inspection (qualified person)

    Book a qualified person once a year for the equipment nobody on staff can honestly assess: the vehicle lifts, the dust collection system and its ductwork, the welding bay extraction, the compressor and receiver, and the fixed machinery against the manufacturer's own installation and operating instructions for each model rather than against a generic form. Where the equipment has its own inspector qualification, use somebody who holds it. File each report against this task, record who performed it and the qualification they hold, and open a corrective-action item for every cited deficiency naming who owns it and when it is due in the item note, so the closure of each one is on the record. Where your own jurisdiction, your district or your insurer sets the frequency or the inspector's qualification, that governs. Telure records the inspection; it does not issue, verify or endorse anybody's qualification. Part of the Telure Standard: the manufacturer's manual governs all equipment intervals.

The basis register

What informs this pack, at what reference depth, and when each entry was last checked against its source. An entry here means the pack is informed by the document named; it never means the pack, or any facility using it, is certified to or compliant with it.

SourceTierJurisdictionAccessVerified
29 CFR Part 1910US Occupational Safety and Health AdministrationOSHA general industry regulations for employee safety. OSHA has stated that general-industry standards govern employees at amusement and water facilities, while patron safety is regulated at the state level. Public domain.Tier 1Public lawUSFree to readChecked 2026-08-31
OSH Act General Duty Clause, section 5(a)(1) (29 U.S.C. 654(a)(1))US Congress / US Department of LaborEmployers must keep the workplace free of recognized hazards likely to cause death or serious physical harm to employees. Public domain.Tier 1Public lawUSFree to readChecked 2026-08-31
Manufacturer documentation for installed equipmentOperator-supplied manuals, bulletins and service documents. Where any pack cadence differs from a manufacturer's documented interval, the manufacturer's interval governs.Tier 5Manufacturer documentationn/aOperator-suppliedNot independently verified
Tier 1Public law. Public-domain law and government works. The text itself can be quoted verbatim.
Tier 2Standard incorporated into law. A privately published standard that some jurisdictions incorporate into law. Cited by designation; the adopting jurisdiction decides which edition applies.
Tier 3Voluntary consensus standard. A voluntary private standard. Cited by designation, with the topic described in Telure's own words, never the standard's text.
Tier 4Trade association practices. Trade association rules, practices and guidance, referenced by name.
Tier 5Manufacturer documentation. The manufacturer's own documentation for installed equipment, supplied by the operator. It governs equipment inspection types and intervals wherever it differs from the pack.

The entries above ground specific slices of this program (workplace safety for staff, published guidance, the manufacturer's own documentation). The rest of the pack is Telure's own curated practice, and is stated as such.

The manufacturer’s documentation governs

Where a manufacturer's documentation sets an inspection type or an interval for a piece of equipment, that documentation governs. The pack's cadences are a program to build on, not a replacement: when the two differ, Telure shows the difference so it can be seen and documented, and the recorded schedule follows the manufacturer.

Where Telure stands

The Telure Standard is Telure's own curated program. Telure is not affiliated with, endorsed by, or licensed by any standards body or association named here, and adopting the Telure Standard does not make a facility compliant with, approved under, or certified to any standard. Where equipment is involved, the manufacturer's documentation governs inspection types and intervals.

All facility typesTelure Standard 2026.1